Monday, September 30, 2019

SWA Architecture Weekly Blog

Hello and welcome back to an all new fresh SWA Architecture weekly blog coming your way as we end September.  The blog like not other where we take a look at different projects that SWA Architecture has been a part of.  We dedicated two posts last week to Corepower Yoga with two new locations under construction.





This week we take our sights to a project that is still in the design phase.  The pictures show what is there now, a mixed use commercial/residential landmark building.  The drawings that we have attached show a renovation that we have proposed.









We are the architects, planners, expediters, landmark expediters and landmark architects for the repair for the sidewalk vault and for providing handicap accessibility to the cellar 1st and 2nd floor.  This is our 10th project with this client.  If you read a our blog consistently then you will consistently see that many of our clients come back for multiple projects.  Clearly we know what we're doing.





That's it for this weeks SWA Architecture weekly blog.  Stay tuned for another post to come your way later this week with some bold work!  Also, as always please give us a follow on instagram - @swa_architecture to comprehensively see all the projects we have previously posted about!

No comments:

Post a Comment